Opsync

For commercial subs bidding through Procore, BuildingConnected and email

Is Addendum 4
in our number?

Opsync builds your ITB board, bid/no-bid rules and addendum log inside your own Google Workspace, for a fixed quote. It never touches your estimate.

Book the free 20-minute assessment (opens Calendly in a new tab)

With Wasim Sajjad, who builds it. No plans needed.

or email wasim@opsync.co

ADDENDUM NO. 4ISSUED THU 6:40 PMBID DATE UNCHANGED

Sheet index

Medical office building, 6 stories

Bids due Fri 2:00 PM local time

Sample data. Not a client.
SheetTitleRev
G-001COVER SHEET AND SHEET INDEX44
S-101FOUNDATION PLAN2
S-201FRAMING PLAN, LEVEL 22
A-101FLOOR PLAN, LEVEL 13
A-121REFLECTED CEILING PLAN, LEVEL 144
A-201EXTERIOR ELEVATIONS3
A-501ROOF PLAN AND DETAILS2
A-601ROOM FINISH SCHEDULE1
FP-101FIRE PROTECTION PLAN, LEVEL 10
P-601PLUMBING FIXTURE SCHEDULE2
M-601MECHANICAL SCHEDULES3
E-601LIGHTING FIXTURE SCHEDULE44

Addendum 4 revised A-121 and E-601. Flagged to the estimator holding the electrical takeoff.

Thu 7:05 PM

IN THE NUMBER

Yes. Your estimator acknowledged it on the bid form Fri 1:12 PM.

Sample sheet index for a medical office building after Addendum 4. Revised sheets are clouded and marked with a delta. Electrical sheets are highlighted. Sample data, not a client.

Example trade: Electrical

Change trade