WORKFLOW EXAMPLES

What Opsync builds for subcontractors.

These are the core workflow layers we use to clean up bid operations for commercial subcontractors handling invites, documents, revisions, and status tracking across multiple systems.

Anonymized client case study

Bid management automation for a commercial facade subcontractor

Northeast US

The team needed one structured workflow that could centralize invites, qualify jobs earlier, organize drawings automatically, surface revisions before bid day, and keep proposals from disappearing after submission without changing how estimators actually worked.

Core pain

  • - Bid invites were spread across email, BuildingConnected, and Procore with no single intake layer.
  • - GC relationship context and location fit were not built into the first-pass review process.
  • - Addendums and supporting files were getting buried in inboxes and inconsistent folders.

What was built

  • - Centralized intake for email, BuildingConnected, and Procore invites
  • - Qualification rules using GC history, geography, and fit signals
  • - Bid / no-bid response handling for faster GC communication
  • - Google Sheets logging for live bid tracking and status visibility

Outcome

  • - Manual bid admin dropped sharply because the estimator no longer had to triage every invite by hand.
  • - Document handling became more consistent because files were organized into one repeatable Drive structure.
  • - The team gained clearer visibility into what was being pursued, what had changed, and what deserved attention first.
  • - Submitted proposals stayed active longer because follow-up happened systematically instead of inconsistently.
  • - Win / loss visibility improved because reasons were captured instead of disappearing into email threads.

SUPPORTING WORKFLOW LAYERS

Bid Intake

Workflow component

Qualification and bid routing layer

Problem

Teams manually decide what is worth bidding without a first-pass system for GC history, geography, and project fit.

Solution

Apply rules before estimator review so low-fit or low-priority opportunities do not consume the same manual effort as strong bids.

Systems involved

Qualification RulesRelationship TagsLocation FiltersBid Status Logic

Cleaner first-pass triage before time gets burned.

Document Control

Preconstruction document workflow

Addendum and Drawing Control

Problem

Revisions, updated plans, and supporting files are buried in inboxes and personal download folders. Teams are never fully sure they are pricing off the latest set.

Solution

Auto-detect addendums, download the right files, maintain a structured Drive folder tree, and flag changes that require estimator attention.

Systems involved

GmailGoogle DriveDocument ParsingRevision FlagsFolder Templates

Cleaner document control and less risk of missing critical revisions.

Pipeline Visibility

Estimating operations layer

Bid Pipeline Visibility

Problem

Once proposals are submitted, follow-up notes, ownership, and outcome reasons are split between spreadsheets, inboxes, and memory. Leadership has no clean view of what is being pursued or why jobs were won or lost.

Solution

Trigger follow-up after submission, track the response path, and log win / loss reasons in one live system built around your existing team habits.

Systems involved

Google SheetsDashboardsStatus WorkflowsEmail LogsAlerts

Clearer visibility across submitted proposals and fewer dropped follow-ups.